Fieldmans on Site
Staff at Fieldmans take pride in ensuring high levels of customer satisfaction and compliance with the "Considerate Contractors Scheme". At a recent audit, a site monitor report concluded "A pleasure to visit a site where high standards set initially have been maintained and built upon. An excellent all round approach displayed to all aspects of the CSS code. The site is a credit to the scheme".
Click here to view the summary report which averaged a score of 38.5 - only awarded to exceptionally good sites.
Click here to see details of the scoring criteria.
Below are example images of Fieldman's engineers at work.
![]() |
A raised access floor showing a number of services wired underneath. |
| Fieldmans provide a thorough under-floor clean after installation of a raised access floor. | ![]() |
![]() |
Floor panels can be shaped and cut safely on site by specialist trained Fieldmans staff. |
![]() |
The floor panels are fitted on adjustable pedestals, which can be raised/lowered to create a floor void height as required. | ![]() |
![]() |
Panels are quickly and easily raised for performing maintenance or making changes to the services that run underneath the raised access floor. |
|
Floor panels can be screwed down if required, or can rest on pedestals as shown above. |
![]() |
![]() |
After installation the raised access floor is checked panel-by-panel for quality assurance. |
|
Fieldmans have a number of staff also trained in fire safety and first aid to ensure the highest levels of site health and safety are maintained. |
![]() |